VA MPR Changes May 1, 2026: Radon, Sheds, and Pre-1978 Paint Rules Removed
Pamphlet 26-7 Change 46: five VA MPRs that disappeared May 1, 2026 including radon, sheds, and pre-1978 paint.

The VA's Minimum Property Requirements (MPRs) often trip up brokers, especially when changes occur. With the recent updates effective May 1, 2026, understanding these changes is crucial for smooth loan processing. The VA Pamphlet 26-7 Change 46 has removed several MPRs, including those related to radon, sheds, and pre-1978 paint. Let's explore what these VA MPR changes mean for brokers and how they impact the appraisal process.
What MPRs were removed in May 2026?
The VA Pamphlet 26-7 Change 46 outlines the removal of five specific MPRs. These changes, effective for all VA appraisals ordered after May 1, 2026, aim to streamline the appraisal process by eliminating requirements deemed unnecessary. Here are the key removals:
-
Detached Improvements and SAH RLC Jurisdiction: Previously, certain detached improvements like sheds required specific considerations. These have now been removed, simplifying the appraisal process for properties with such features.
-
Non-Vented Heater: This requirement has been eliminated, reducing the need for appraisers to note the presence or absence of non-vented heaters.
-
Properties Built in 1978 or Later: The guidelines for these properties have been condensed, removing some of the detailed requirements that previously applied.
-
Properties Built Before 1978: The phrase “or related improvements” has been removed, which simplifies the requirements concerning older properties, particularly in relation to lead-based paint concerns.
-
Radon Gas: The requirement to assess radon gas has been removed entirely, reflecting a shift in how environmental hazards are evaluated.
How do these changes affect appraisals?
The removal of these MPRs means appraisers will have fewer specific conditions to evaluate, potentially speeding up the appraisal process. Here’s how each change might impact appraisals:
-
Detached Improvements: Appraisers no longer need to assess sheds or similar structures under specific MPRs, which can reduce the complexity of appraisals for properties with multiple structures.
-
Non-Vented Heaters: Without the need to note these heaters, appraisers can focus more on other critical aspects of the property.
-
Pre-1978 Paint: By removing the phrase concerning related improvements, appraisers may find it easier to evaluate older homes without getting bogged down by extensive lead-based paint requirements.
-
Radon Gas: The elimination of radon gas requirements means appraisers are not obligated to report on this environmental factor, although buyers may still choose to conduct independent radon testing.
What should brokers do in response to these changes?
Brokers should update their processes and educate their teams about these changes to ensure compliance and efficiency. Here are some practical steps:
-
Review and Update Training: Ensure that all staff are aware of the changes to the MPRs. Training sessions or updated guidelines can help keep everyone informed.
-
Communicate with Appraisers: Establish clear communication with appraisers to understand how these changes might affect their evaluations and reports.
-
Advise Clients Appropriately: While certain MPRs have been removed, clients may still have concerns, especially about environmental factors like radon. Brokers should advise clients on optional inspections or tests that might be beneficial.
-
Stay Informed: Regularly check for updates to VA guidelines and ensure that all procedures align with the most current standards.
What are the broader implications of these MPR changes?
The removal of these MPRs reflects a broader trend towards simplifying the appraisal process and reducing unnecessary regulatory burdens. This can lead to faster processing times and potentially lower costs for buyers, as fewer conditions need to be met or rectified.
For brokers, staying ahead of these changes is crucial. It allows for better client service and ensures that transactions proceed smoothly without unexpected delays due to outdated requirements.
In conclusion, the VA MPR changes effective May 2026, particularly concerning radon, sheds, and pre-1978 paint, represent a significant shift in the appraisal process. By understanding and adapting to these changes, brokers can enhance their operations and provide better service to their clients.
This article is for informational purposes only and is not professional advice. Always verify against current guidelines before making decisions.
Ready to streamline your loan operations?
Loanwright gives you file readiness checklists, guideline search, and condition tracking in one place.
Or browse our mortgage broker resource hub for primary-source guideline handbooks and regulatory references.
Related posts
VA Loan Assumptions in 2026: Secondary Borrowing, Fees, and Forms
Synthesis of active VA circulars on assumptions: secondary borrowing, fees, and applicable forms in 2026.
VA Energy-Efficient Homes and HERS Scores in Residual Income Underwriting
Circular 26-25-7: HERS score rule in residual-income underwriting for energy-efficient homes.
VA Loan Limits in 2026: Conforming Limit Changes and Partial Entitlement
Circular 26-25-10: how the 2026 conforming loan limit changes partial-entitlement math.